MILESTONES

Artist Rendering of New Building

Artist Rendering of the new West Hempstead Public Library

Please check back frequently for new photos.

February 1, 2008 Wearing Red for Women - Staff photos
January 13, 2008 Dedicating the Skrocki Mural in the Children's Program Room
October 29, 2007 Opening in the New Library!
October 21, 2007 Gala Opening: Ribbon-cutting ceremony, speeches, refreshments, entertainment and tours of the new library. (see the slideshow)
October 18, 2007 Long Island Distinctive Authors Reception : Friends of the Library fundraising event featuring ten local authors signing their books. (see the slideshow)
October 18, 2007 Nearing Completion: Furniture has been delivered and set up in the Main Library and Reference areas, Children's Room and Young Adult areas. Preparations are underway for the Author Reception and for the Gala Opening Celebration. Giftbricks have been laid in the Memorial Pathway leading from the parking lot to the library entrance at 500 Hempstead Ave. (see the slideshow)
October 4, 2007 Move Continues: Children's room and Young Adult area near completion. Audio-visual and Fiction collections have been moved. Parking lot is being re-furbished. (see the slideshow)
September 25, 2007 Move Begins: In the new library. (see the slideshow)
September 25, 2007 Packing Up: In the old library. (see the slideshow)
August 13, 2007 Staff visits site : Photos for August. (see the slideshow)
June 18, 2007 Progress report #15: Photos for June. (see the slideshow)
May 21, 2007 Progress report #14: Photos for May. (see the slideshow)
April 23, 2007 Progress Report #13: Installation of the standing seam roof began on April 9, 2007. Flat roof pitch pockets for all roofing penetrations have been installed. Installation of the curtain wall framing for the clearstory windows and clearstory window frames have begun. EFCO windows for the lower elevations are due for delivery on April 25th. Pressure tests for all plumbing installations (water, waste, vent & gas) have been performed and documented. Ductwork for the second floor is currently 85% complete. Electrical branch wiring for the first floor power, lighting and alarms is near completion. Installation of the south basement light fixtures began on April 19, 2007.(see the slideshow)
March 26, 2007 Progress Report #12: Installation of the roofing insulation and underlayment and OSB insulation are underway. Standing seam roof installations are scheduled to begin by March 30. Installation of the interior soffit framing in the main library and second floor “clearstory” is currently 95% complete. Installation of the gas meter piping, distribution piping, Sewer ejection pumps and hot water heater are near completion. HVAC ductwork installations in the first and second floor chase walls and Electrical branch wiring for power and lighting are in process.(see the slideshow)
Feb. 26, 2007 Progress Report #11: Installation of the roofing insulation and underlayment began on all the flat roofs. The standing seam roof was scheduled to begin by March 15, 2007. Installation of the soffit framing around the perimeter of the roof edge began. The installation of the hot & cold domestic water piping and control valves in the basement are underway. The RPZ backflow device was installed on the first floor. Electrical branch wiring for power & lighting in the basement began. Installation of the main feed riser from the basement to second floor was completed on February 22, 2007. The installation of the breaching for the boilers was installed. Automatic temperature control (ATC) wiring installations began. (see the slideshow)
Feb. 5, 2007 Progress Report #10: Exterior masonry walls were completed with the installation of cast stone at the front canopy entrance. Installation of the interior framework on the basement and first floor continued throughout January. Hot water piping installation for the basement and first floor is currently 85% complete. The waste and vent piping for the first and second floor bathrooms has been “roughed-in” and is currently 75% complete. The concrete stair treads for Stair # 1 and # 2 were poured. Installation of wood blocking around the perimeter of the roof edge is currently 75% complete. Roofing installations are underway. Installation of the temporary window enclosures began on January 4th and portable heaters were delivered to the site on January 26, 2007. (see the slideshow)
Dec. 18, 2006 Progress Report #9: Installation of the sprinkler piping in the basement completed. Installation of the exterior sheathing nearly complete. First floor hollow metal door installed and canopy roof for the main entrance framed. Installation of the underground storm drainage systems at the east and west elevations completed. All soil backfilled and compacted. Layout and mobilization for the exterior masonry walls began on December 4th .  As of December 18, 2006, 60% of the split-face block has been installed and the first cast stones have been set. HVAC Installations for the basement and first floor ductwork is ongoing, as well as work on the modular boilers and basement bathrooms. (see the slideshow)
Nov. 27, 2006 Progress Report #8: Steel deck studs were installed on the first floor deck.  Underground drainage for the north and south elevations were completed; east elevation is underway. Installations of Steel Stairs were completed.  Floor slabs were poured and cylinder samples taken for concrete testing. Exterior framing is 95% complete. Exterior sheathing is 50% complete. Installation of temporary lighting for the first floor was completed. Installation of the steel decking for the flat roof was completed. Consultants inspected decking installation upon completion and signed-off. (see the slideshow)
Oct. 23, 2006 Progress Report #7: Phase II of the structural steel erection began with the installation the of the structural steel columns at the slab on grade / north elevation. All remaining structural steel columns & beams were erected and completed.  A structural steel survey was performed to check that all structural steel was “plumb” and deck studs could be installed.  Electrical conduits were installed in the steel decking at the first floor elevation to prepare for the concrete pour. (see the slideshow)
Sept. 25, 2006 Progress Report #6: Completion for Phase 1 of the structural steel erection was completed by August 25, 2006. The concrete pour for the SOG was completed on September 18, 2006. Anchor bolt survey for SOG was performed on September 25, 2006, to prepare for phase II of the structural steel erection.(see the slideshow)
Aug. 21, 2006 Progress Report #5: The excavation and the installation of the concrete footings & piers at the SOG was completed by August 8th, 2006. Final leveling & compaction of the SOG soil in preparation for the crane delivery was completed on August 9th, 2006. The underground storm drainage piping at the SOG was installed on August 10, 2006. Phase 1 of the structural steel erection began on August 16, 2006. (see the slideshow)
August 17, 2006 See more August activities
August 16, 2006 The first steel is set in place!
July 31, 2006 Basement concrete poured. Next comes structural steel!
June 26, 2006 Progress on foundation since May 18
May 18, 2006 Foundation formwork is removed after pour
May 8, 2006 Foundation wall formwork
May 2, 2006 First Concrete is Poured
May 2, 2006 Installation of footing formwork
April 30, 2006 Groundbreaking Ceremony
March, 2006 Site Photos: Before and After March 2006